Wednesday 16 July 2014
ATTIC WORK
This morning found me up in the attic adding some more bracing to the roof truss that supports Mary's swing.
You can see the bolt the swing hangs from just behind the drill. I glued and screwed the 2x6 running off to the right. This will add some additional stiffness to the roof truss and help spread the load when I use the swing.
Next job is checking the batteries and adding water where needed.
It's cool this morning, only 10*C
Thanks for stopping by.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment