Today the guys are here putting down the tubing for our radiant floor heating.
Outside TJ and Dave are working on the siding, soffit, and trim around the windows.
TJ built a little jig so the soffit sheets could be cut quickly.
The saw slides in the grooves and is drawn backwards across the aluminium sheet.
Inside Charlie and Jason are studying the plans before starting on the tubes.
This tubing is specially built for radiant floor applications and it will take the abuse when we pour the cement over it.
It's a perfect day in Bancroft. At 11:30 am it is 24*C, with a slight breeze to keep the black flies away.
Thanks for stopping by, there will be more pictures tomorrow.
Monday, 7 May 2012
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment