One undertaking in Bancroft last year was murals for the downtown core. Each mural shows a scene of the street and some history about the person the street was named after. The project involved most of the community, including the schools who selected students to write the brief history on each mural, as well as hundreds of community members who took on the task of painting each square before it became part of the mural. When you look at the pictures it is easy to see each square that was individually painted.
Mary admires one of several murals she contributed to.
We had no idea that Bancroft had its own octagon house until we read one of the murals. Had to get a picture, so here is the octagon house on Alice St. Alice was the first postmistress in Bancroft and held the job for 50 years. WOW! 50 years. I can't imagine working at the same job, same place for 50 years.
Caught this family out for a spring walk with the newest offspring.
Mom wasn't so happy that we were driving by slowly on "her" road. Click on the picture to see the goslings scrambling through the grass for safety.
Wednesday, 9 May 2012
Tuesday, 8 May 2012
New Home
Not only were we busy in Bancroft yesterday but I had to meet Mary in Peterborough and bring her home.
Sean and Casey gave us a tour of their cute little home in Peterborough. Here Sean is about to see it for the first time.
Just imagine the parties this pool has seen and I'm sure Casey and Sean will be throwing a few.
The backyard is huge and the best part is the extra large cabana/storage shed. Sean already has plans to set up a bike shop out there.
Back in Bancroft the guys were getting more tubing down. So far we have gone through 1,000 ft. and I think we are about 30% done.
Today it's raining and miserable so not sure what work will be accomplished outside.
Thanks for stopping by. Any questions?
Sean and Casey gave us a tour of their cute little home in Peterborough. Here Sean is about to see it for the first time.
Just imagine the parties this pool has seen and I'm sure Casey and Sean will be throwing a few.
The backyard is huge and the best part is the extra large cabana/storage shed. Sean already has plans to set up a bike shop out there.
Back in Bancroft the guys were getting more tubing down. So far we have gone through 1,000 ft. and I think we are about 30% done.
Today it's raining and miserable so not sure what work will be accomplished outside.
Thanks for stopping by. Any questions?
Monday, 7 May 2012
Radiant Floor Heating
Today the guys are here putting down the tubing for our radiant floor heating.
Outside TJ and Dave are working on the siding, soffit, and trim around the windows.
TJ built a little jig so the soffit sheets could be cut quickly.
The saw slides in the grooves and is drawn backwards across the aluminium sheet.
Inside Charlie and Jason are studying the plans before starting on the tubes.
This tubing is specially built for radiant floor applications and it will take the abuse when we pour the cement over it.
It's a perfect day in Bancroft. At 11:30 am it is 24*C, with a slight breeze to keep the black flies away.
Thanks for stopping by, there will be more pictures tomorrow.
Outside TJ and Dave are working on the siding, soffit, and trim around the windows.
TJ built a little jig so the soffit sheets could be cut quickly.
The saw slides in the grooves and is drawn backwards across the aluminium sheet.
Inside Charlie and Jason are studying the plans before starting on the tubes.
This tubing is specially built for radiant floor applications and it will take the abuse when we pour the cement over it.
It's a perfect day in Bancroft. At 11:30 am it is 24*C, with a slight breeze to keep the black flies away.
Thanks for stopping by, there will be more pictures tomorrow.
Sunday, 6 May 2012
Next Week
Another busy week ahead of us. Monday we expect the heating tubes to be installed. I'll post pictures once the guys are finished. While that work is being done, Dave and TJ will be putting the trim around the south and west windows and installing the steel siding on Wednesday and Thursday. Friday we have booked the cement crew to come and pour the slab. As I said, another busy week.
Forgot to mention:
Kim and Charlotte saw a black bear on our road last week. Hope he hangs around for the summer and drops by for a visit. The only four legged critter I saw last week was a porcupine, waddling across the road. He was in no hurry, so I shut the truck off and sat and watched. Mighty fine country.
Forgot to mention:
Kim and Charlotte saw a black bear on our road last week. Hope he hangs around for the summer and drops by for a visit. The only four legged critter I saw last week was a porcupine, waddling across the road. He was in no hurry, so I shut the truck off and sat and watched. Mighty fine country.
Friday, 4 May 2012
Spray Foam Under the Slab
Today the crew arrived about 8:30 to lay down the under slab spray foam. This will be done in 3 passes, each pass being 2inches thick.
As you can see they are just getting started. Bill first sprayed around all the drain and plumbing pipes. Next he went back and did a first covering of the floor.
I'll post more pictures at the end of the day.
Thanks for dropping by.
Up-date 1 pm
The first layer of spray foam is now complete.
The entire floor area has now been covered with 2" of spray foam. Bill will make two more passes before the job is finished. What is amazing is the fact that you can walk on this product shortly after it has been sprayed into place.
Here Bill works at feathering the edge so we get a complete seal up the side of the wall. It will also act as a thermal break between our cement slab and exterior walls.
A close up view of the spray on the walls. (the spray foam now comes up to the bottom of that step)
The crew (Bill and his helper) left about 5:30 and these last few pictures show the floor area complete and ready for the heating coils on Monday.
Looking towards the south wall from the north end of the house.
Where the wall and floor will meet we sprayed up the wall to give us a continuous seal along that seam. (The cement floor will come to the top of the purple spray foam.)
Front entrance. We had Bill spray the area under the slab entrance to help reduce frost penetration.
Note the base of the sliding door. This is where the cement will cover once we have it poured.
Another good day on site.
As you can see they are just getting started. Bill first sprayed around all the drain and plumbing pipes. Next he went back and did a first covering of the floor.
I'll post more pictures at the end of the day.
Thanks for dropping by.
Up-date 1 pm
The first layer of spray foam is now complete.
The entire floor area has now been covered with 2" of spray foam. Bill will make two more passes before the job is finished. What is amazing is the fact that you can walk on this product shortly after it has been sprayed into place.
Here Bill works at feathering the edge so we get a complete seal up the side of the wall. It will also act as a thermal break between our cement slab and exterior walls.
A close up view of the spray on the walls. (the spray foam now comes up to the bottom of that step)
The crew (Bill and his helper) left about 5:30 and these last few pictures show the floor area complete and ready for the heating coils on Monday.
Looking towards the south wall from the north end of the house.
Where the wall and floor will meet we sprayed up the wall to give us a continuous seal along that seam. (The cement floor will come to the top of the purple spray foam.)
Front entrance. We had Bill spray the area under the slab entrance to help reduce frost penetration.
Note the base of the sliding door. This is where the cement will cover once we have it poured.
Another good day on site.
Wednesday, 2 May 2012
Wrong Colour
Not every day is smooth. Today the guys worked on small jobs until lunch when the soffit and facia material was delivered. Great, now we can get moving on finishing the house exterior. Unfortunately, someone sent the wrong colour, so back to the supplier this goes and we will have to wait until next week for the delivery of the sheets we ordered. Small setback.
Tomorrow the inspector will be here to check the drain installation. If all is good then the spray foam will be done Friday and the heating cables on Monday. Looks like we could have the floor down by next weekend. Keep your fingers crossed.
Thanks for stopping by.
Tomorrow the inspector will be here to check the drain installation. If all is good then the spray foam will be done Friday and the heating cables on Monday. Looks like we could have the floor down by next weekend. Keep your fingers crossed.
Thanks for stopping by.
Tuesday, 1 May 2012
Cat Walk and Chainsaw
Another productive day and we are exhausted. Worked the bobcat for several hours helping the guys prep the entrance way for the cement slab next week.
First we removed the excess sand and rubble, then TJ snapped a line to show the top of the concrete slab.
TJ made a parallelogram to easily determine the slop of the grade for our entrance. I was impressed.
Dave was up in the rafters building us a "cat walk" so if needed we can get up there without disturbing the insulation.
Once we were done with the bobcat I helped Mary clear bush and burn the small stuff. It also helped to keep the black flies away. They are out but not biting.
Dave is our knowledgeable woodsman. He builds wonderful furniture from logs and knows how to look after his tools. Here he explains the proper technique for sharpening a chainsaw.
TJ tries his hand at sharpening the chain using a file set in a guide. I think he succeeded. Our saw works much better now. Thanks guys.
Thanks for dropping by.
First we removed the excess sand and rubble, then TJ snapped a line to show the top of the concrete slab.
TJ made a parallelogram to easily determine the slop of the grade for our entrance. I was impressed.
Dave was up in the rafters building us a "cat walk" so if needed we can get up there without disturbing the insulation.
Once we were done with the bobcat I helped Mary clear bush and burn the small stuff. It also helped to keep the black flies away. They are out but not biting.
Dave is our knowledgeable woodsman. He builds wonderful furniture from logs and knows how to look after his tools. Here he explains the proper technique for sharpening a chainsaw.
TJ tries his hand at sharpening the chain using a file set in a guide. I think he succeeded. Our saw works much better now. Thanks guys.
Thanks for dropping by.