The building inspector was here shortly after 7:30 this morning and all was well. Pat and crew then left for another site leaving me to backfill around the frost wall and check on the progress of the stone slinger.
This slinger can unload 20,000 kg of gravel in about 20 minutes and place it exactly where you want it to go.
Perfect weather for working outside.
Six loads of gravel, all over 20,000kg. Have you ever tried to shovel this stuff?
Once the backfill is complete, we start building the walls and installing the windows. Oh, mustn't forget to install the drains. Have a great weekend.